Sales start! Off-plan project - hotel-type residence in Antalya, Altintash

Object ID: 8299
Object ID: 8299
Object ID: 8299
Object ID: 8299
Object ID: 8299
Object ID: 8299
Object ID: 8299
Object ID: 8299
Object ID: 8299
from: 205,000
About the object
Property ID
8299
Property type
Rooms
1+1, 2+1
Bathrooms
1+
Balcony
1+
Size
50
distance to the beach
3,5 км
distance to airport
500 м
Completion year
декабрь 2025
Price per sq / m
4,100
Complex features
Solar batteries
24/7 CCTV
Playground
Children's swimming pool
İndoor parking
Indoor pool
Charging for electric vehicles
Game room
Wi-Fi
Elevator
Lobby
Massage rooms
Mini club
Swimming pool
Security 7/24
Steam bath
Reception
Garden
Sauna
Private beach
Satellite TV
Shuttle to the beach
Fitness
Hamam
Power generator
!Grant Residence Permit

Pencil stage real estate from a major developer at the lowest starting prices in the eastern part of the city is an ideal investment offer!

The uniqueness of the project is its unique original architecture, a building designed by a talented architect. The complex consists of three blocks with 5 floors — 331 apartments. As well as a large selection of varied and spacious apartment layouts. The project includes the entire sector of the most exciting entertainment - the richest infrastructure of a 5-star hotel. Including concierge services, dry cleaning, carpet cleaning, maintenance, car rental, courier service, veterinarian and doctor. As well as free service to the private beach in Lara, to Antalya Airport and the Mall of Antalya, Deepo, and Agora shopping centers. The beach is 3.5 km away, the shopping center is 4 km away, the airport is 500 meters away.

Features of buildings: In accordance with earthquake regulations; In accordance with construction supervision regulations; In accordance with fire safety regulations. A ground survey was carried out. As well as high-quality insulation and mechanical siding.

There are two types of layouts to choose from: 1+1 and 2+1, the area varies from 50 to 102.5 m2.

Features of the apartment: Floor heating; Electric boiler; A set of household appliances; Air conditioners; Smart home system; Aluminum systems for doors and windows; Kitchen, bathroom and wardrobe cabinets (painted with varnish); American door (lacquered painting); 60x120 ceramic floors or their analogues; Shower cabin; Steel door; Blind box. Products that meet European standards certified according to ISO and CE will be used in construction and decoration.

The project is being implemented on a plot of 10,155 m2. The land is owned by the developer and will be sold exclusively at the developer's expense.

At the entire stage of construction, installments are provided at 0%. The minimum down payment is 35% of the full cost of the selected apartment.

Construction period: Start — September 2023; Commissioning — December 2025

All additional information is available from our specialists. We will be happy to tell you about the best deals and find the most profitable option!

Print page